HM undertook a full measured survey, produced plans of the existing and designed proposals; carried out a structural survey, submitted plans to the Local Authority for Planning Permission and Listed Building Consent. Involved in appointing Ecologists.
MORE PHOTOS
CLICK TO RETURN TO ALL CASE STUDIES |